Material documents every component. Except the one that ships them.

Warren Velazquez. Two years embedded at Google as the agency, then four managing agencies from the client side. Program management for design systems, 13+ years, documented here in the format this team already reads.

program / v6.0 · stable

Builds the system, gates the brand, plans the work.

Currently at Dow Jones: a design system that absorbs new event sites as the company defines them, the brand gate for product surfaces, and Relay, the AI intake he built. Previously ran android.com through a major OS launch.

Six teams with competing priorities, six spreadsheet formats, thousands of cells.

That is his intake at Dow Jones. The teams email spreadsheets; Relay, which he built, reads them into one prioritized, resourced plan. Pressure is an input, not a state of mind.

Android 12 launched on a public date that could not move.

Roadmap, creative, content, deployment and localization across android.com, tv.google and wearos.google.com. The date held and the team did not burn out, which is the part a Google director put on record.

SPECS

The spec, row by row.

Ten requirements from the posting. Ten receipts. Tap any row to jump to its proof.

The role requiresOn record
01 Drive UX design development and sprints with 1P partners Ran design and development sprints and roadmaps for android.com, tv.google and wearos.google.com, embedded at Google for two years. behavior/immovable-date
02 Manage third-party design agencies Has sat in both chairs: was Google's agency at Huge, then managed Monaverse, Moving Brands and an Infosys team of 28+ engineers. behavior/both-chairs
03 Integrate UXR research into the process A 3-month research phase before an 8-month design phase at APS. A year-long future-formats UX exploration with Google's Search UX Design Director. behavior/both-chairs
04 Execute within components with Eng and platform PgMs Stewarded the APS design system into production with 28+ engineers. Currently migrating 8 core properties into one system at Dow Jones, 6 done so far, so new event sites are assembly, not invention. behavior/the-system
05 Manage narrative content programs Owned content and localization for android.com, tv.google and wearos. Oversees content design and copy at Dow Jones today. release-history
06 Drive creative and icon-scale asset programs with cross-functional teams The brand gate on product surfaces at Dow Jones, partnering with product design and commerce teams while overseeing design, content design and copy. Hundreds of assets through one stage-gated pipeline at GE. release-history
07 Own release schedules and milestones at high velocity Android 12 on an immovable public date. About 8 events and 6 launches in the last 5 months, absorbed by the system rather than by heroics. behavior/immovable-date
08 Manage intake and prioritization with cross-functional partners Six teams with competing priorities, six spreadsheet formats. He built Relay, the AI intake and planning layer that turns them into one resourced plan. behavior/intake
09 Ensure resourcing against key efforts Owns the team's Asana capacity and resource system. "Meticulous capacity planning" per a Google director. behavior/cadence
10 Coordinate dependencies and communicate risks to leadership One launch calendar across three Google properties. Review cadences at APS and GE built to surface misalignment early, not at launch. behavior/the-system

Source: the Program Manager III, Material Design posting, Google Design Platform, Core. Every receipt links to a section of this page.

BEHAVIOR / THE SYSTEM

Eight properties. One system. Build time down about 80 percent.

Dow Jones defines new events every other week. Warren leads the design system built to absorb that: one component set across 10+ event and conference sites for WSJ, Barron's and MarketWatch, so every new site is assembly instead of invention. Engineering time drops about 80 percent, and stakeholder review rounds and repeated design decisions drop with it, because the system already made them.

~0%
less build time per site since migration

6 of 8 core properties migrated. The two outlined tiles are not animated because they are not done. This page does not round up.

On the 80 percent: that is engineering time to stand up a new event site, measured against the pre-system baseline, and it keeps its "about" because it is an estimate across sites rather than a single number off a dashboard.

BEHAVIOR / THE IMMOVABLE DATE

The date didn't move. Everything else did.

Android 12 launched on android.com on a public date. Warren ran roadmap, creative, content, deployment and localization across android.com, tv.google and wearos.google.com, one calendar over three properties with shared components and independent release dates.

First planLaunch-ready

Drag the slider. The lanes compress and reflow around a launch line that is the only element on this page with no animation. The lane widths are schematic, not measured; the ordering and the overlaps are how the program actually ran.

BEHAVIOR / INTAKE

Six vocabularies in. One schema out.

Warren is the brand gate on product surfaces at Dow Jones, which means six teams send him their plans and requests in six spreadsheet formats. So he built Relay. The hard part was never sorting things into three buckets. It was reading intent out of prose, reconciling six vocabularies into one schema, and chasing the fields nobody filled in. Step through it below.

relay.ingest()

Six workbooks, no shared template.

Subscription strategy, product design, product management, performance marketing, CRM and event marketing each send their own file. Asking for one template has never worked, so Relay meets them where they are.

Six teams, thousands of cells. The count is the reason this is a system and not an afternoon.

Warren is Relay's only user, weekly, on real quarterly planning. One person using a system every week is a better signal than a signup count, and he would rather say that than dress it up.
BEHAVIOR / SYSTEMS HE BUILT

Four operations systems, one operator.

Warren is not an engineer and does not hand-write production code. These are operations systems, built for specific problems he ran into in the workplace, and designed around those problems rather than around a demo. None of them is a venture, and none is a product he is selling.

Each one is a real build: several tools integrated so the work does not get re-typed between them, a custom database underneath, AI used where it earns its place, identity and permissions designed in, and hosting and infrastructure he set up and keeps running. He specifies the system, directs AI agents to build it, reviews what comes back and sends it round again, with staff engineer friends advising. The skill on show is knowing what to ask for and recognising when the answer is structurally wrong. Four of them, in four unrelated domains, which means the transferable thing is the method rather than the domain.

The point of building them is not the building. It is what stops taking a person a week: sorting incoming requests, working out who has room, chasing work that arrives specified halfway, and reassembling the same status for a different audience. Those hours go back to the work only the person running the program can do: holding the standard, staffing against it, deciding who to partner with, and making the calls that need judgment. That is the difference between a program manager who administers a function and one who has the hours left to change it, and it is why the ground he covers tends to be wider than the headcount suggests.

PLANNING

Relay

live · sole user

Six teams send quarterly plans in six spreadsheet formats, and reconciling them by hand ate the first two weeks of every quarter.

The AI-hard part. Reading intent out of prose, then collapsing six vocabularies into one schema without inventing the fields nobody filled in.

Where the human stays. Priority and resourcing. Relay proposes a ranking with reasons; Warren decides and every override is recorded.

CAPACITY

The resourcing tool

in real weekly use

The same hour goes wrong in every creative team he has worked in. Agencies, a startup, in-house teams. The resourcing meeting happens, real decisions get made out loud, and then somebody has to remember them and write them up afterwards. Usually late, usually thinner than what was said. The plan drifts out of date until the next meeting rediscovers it.

The loop. The resourcing decision gets made out loud in the meeting. It is captured as it happens and staged for a one-click yes, so nothing changes unless a human confirms it. Once confirmed, the capacity view and the team's plan of record update themselves.

Where the human stays. On the yes. Capacity is computed rather than assumed, so PTO, standing meetings and partial weeks come off the top before anything is promised, and an over-capacity week shows up before the work is promised away.

Built for and used by him, for his own planning. It is not deployed across his employer, and that is a real limitation.

AGREEMENTS

An agreements system

private build

Turns what people commit to in a working session into a reviewed, signed record, so a scope or a hand-off cannot quietly evaporate.

Why it exists. Hiring conversations, vendor scoping and partnership talks all start before anyone has signed anything, and he kept watching the commitments made in them go unrecorded. Built for that, not for a market.

CONFIDENTIALITY

A confidential-sharing system

private build

Lets a team send unreleased work outside the building without losing control of it, with a record of who saw what.

Why it exists. Every creative team he has worked in shares confidential files on trust and cannot prove afterwards who read which page. Built for that, not for a market.

"It turned our weekly planning meeting from a doc-readout into a real conversation, and now the conversation updates the board itself."
Clare Smythe · Design Lead, Dow Jones, on the resourcing tool

Why this matters for a program role and not just for a resume: every agency the Material team hires is now quoting AI-assisted timelines. Someone who has built these systems can tell a real efficiency claim from a markup, and can write a scope that does not get gamed. He builds these to make the program run, not to leave program management. He is happy to walk through it live in an interview.

BEHAVIOR / BOTH CHAIRS

He has been on both sides of your agency calls.

This role manages third-party agencies for the Material team. Warren has done that job, and he has also been that agency, inside Google, for two years.

Huge, Android pod, embedded at Google

Two years as Google's agency-side senior PM. Owned roadmap, creative, content, deployment and localization for android.com, tv.google and wearos.google.com through the Android 12 launch.

Google Search Ads futures

Led 4 to 6 designers for a year-long exploration of future ad formats, partnering directly with Google's Search UX Design Director. Influence with no formal authority, sustained for a year.

What that teaches

Exactly what a 1P partner needs from an agency brief, and exactly where agency work drifts when nobody manages the seam. He knows the failure modes from inside them.

Infosys, 28+ engineers

Stewarded the APS design system into production with a 28+ engineer vendor team, with a review cadence built to catch drift at implementation, not at QA.

Monaverse, end to end

Owned the vendor relationship for The Row at Everyrealm through implementation, platform testing and a single coordinated launch, plus external motion, 3D and video vendors.

Moving Brands and beyond

Agency-side engagements for NYU Langone's design system audit. He knows how agencies are scoped, priced and judged, because he has written both sides of that paperwork.

"Meticulous capacity planning to hit targets across every workstream without burnout. Exceptional communication and problem-solving."
Hulya G. · Director, Web Marketing Strategy, Google
"A team player and problem solver on a complex, multi-part, year-long program. Strong client relationships throughout."
Stacey Wu Eggiman · Sr Interaction Designer, Google
"A great PM. Diligent on the financial, creative and timing details, and a strong voice on UX and design."
Gary Goldsmith · Design Operations, Meta
BEHAVIOR / CADENCE

Cadence and capacity.

The last five months at Dow Jones: about 8 events and 6 launches, every one a fixed-date public go-live. The cadence holds because the system does the repetitive deciding and Relay does the digesting, not because anyone is sprinting.

The line is the pill count above it, nothing more: two, three, four, three, two. May carried four dated go-lives and was the month to watch. Capacity was planned in Asana with Relay feeding the plan, which is the whole reason a four-launch month was a peak rather than an incident.

RELEASE HISTORY

Changelog, 2013 to now.

Oldest first, against changelog convention, because the arc matters. It starts with Google and it keeps returning there.

ROADMAP

What the first 90 days would look like.

Everything above this line is retrospective. This part is not, and it is offered as a starting position rather than a plan, because the real one gets written after the first month of listening.

weeks 1 to 4

Map the seam, not the system.

The system is documented; the seam is not. Where do agency deliverables actually enter Material, who accepts them, and at which step does a component brief stop being legible to the person building it. Same question for the 1P side: what does a surface team send when they need something, and how many places does that request live before it becomes work.

Output: one written map of every intake path and every handoff, with the drop points named.

weeks 5 to 8

Fix the intake before touching the roadmap.

Intake is where a platform team quietly loses its quarter, and it is the thing he has built twice. One request shape, one queue, one place where priority is decided and recorded with a reason. Not a tool first. A schema first, then whatever tool the team already has.

Output: a single intake path in the team's existing tooling, and a prioritization record that survives the meeting it was decided in.

weeks 9 to 12

Put the release calendar on one surface.

Components, guidance and the agency work that feeds both, against the platform dates that do not move. This is the Android 12 problem again at a different scale: shared components, independent release dates, one calendar. He has run exactly that, for two years, on Google properties.

Output: one calendar the whole team reads, and a standing risk review that surfaces misalignment early rather than at launch.

What he would need: an honest hour with whoever currently absorbs the intake, and permission to change the shape of a request before changing anybody's roadmap.

KNOWN ISSUES

Known issues.

Material's own docs are honest about parity gaps. This page follows the convention, because a spec that only lists what works is a brochure.

OPEN

Warren has never carried a Google badge. Two years embedded at Google through Huge is proximity, not membership, and the difference is real.

OPEN

Relay has exactly one user and has not been hardened for a team. It is a working system, not a shipped product, and he would rather say so than let the diagram above imply otherwise.

TIMING

He started his current role about seven months ago, so the obvious question is why he is reading this at all. He is not running from anything. The work is real, he is doing well at it, and he would be content to stay. The reason is a preference that got clear across thirteen years rather than across the last seven months: he does his best work where the design system is the product rather than a support function, where the dates are public, and where the documentation argues in the open instead of behind a door. That is Material. A preference that specific is worth acting on when the role actually appears, rather than discovering in month four that he watched it go past.

MIGRATION PATH

He has seen Material from the surfaces that consume it, at Google scale, on a fixed public date. That is the seam this role manages, viewed from the side that feels it first. He has also spent 13+ years being the other end of this role's phone calls, and the fastest way to manage agencies well is to have been one. The rest is onboarding.